  • Roof preparation
    Modules in preparation
    Modules nearing completion
  • Modules arrive at location
    Modules being picked up

    Modules being craned up

  • Module being raised
    Module being taken into position
    Modules being placed
  • Modules being put in situ
    Services being connected
    Joints being covered
  • From the factory, complete with champagne in fridge
    All finishes and fittings completed in the factory
    Fireplaces are tested with North Sea Gas before the modules leave the factory
  • Bathrooms 100% complete and tested in the factory
    Outdoor areas are complete a week after the modules are installed
    Ready for occupation